OR NOT!
So last week the Engineer was in the shop on Friday. I spoke to him and he said all of the work should be done Friday or yesterday at the latest. So last night we went in and the roof was still leaking water and it doesn't look like they've done anything. Dino (the project manager for the contractor I hired to do the kitchen) had been in however and dropped the front counter (it had to be lowered because the floor was dropped 3 inches to accommodate the ADA stuff) and done a bunch of stuff (like put sheet rock on the pillar in the back).
As you can see, the front is nearly done. The wood at the bottom will be tile. It looks really nice and I am really happy with it so far!
I feel so bad for Stan having to deal with the retrofit guys; they seem like scam artists. The fact they told us directly they would be done with everything no later than Monday and refuse to keep their word (repeatedly), is horrible. And the worst part is we can't put in dry wall or the floor until the roof is not leaking all over everything. So, once again, everything is stopped while we try to get the retrofit crew to do what they have said they are going to do.
That said, things ARE happening. We are working on small projects as best we can and getting organized for the rush before opening. It's still very frustrating to have my livelyhood in the hands of unscrupulous contractors, but I am hopeful we are closer to the end than the beginning.
Tuesday, October 4, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment